The AACE-PSP Certification Exam is designed to test the skills and knowledge of professionals who are responsible for planning and scheduling projects. Planning & Scheduling Professional (PSP) Exam certification is recognized worldwide and is considered one of the most prestigious certifications in the field of project management. AACE-PSP exam covers a range of topics, including project planning, scheduling, monitoring, and control, as well as risk management, earned value management, and resource management.

 

NO.97 Which of the following phases does NOT describe the commonly accepted construction life cycle?

 
 
 
 

NO.98 Determine the correct formula and date for the late finish for Activity 2001.

 
 
 
 

NO.99 Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

 
 
 
 

NO.100 Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT

 
 
 
 

NO.101 What project cost elements would NOT normally be reflected in the Activity 1000?

 
 
 
 

NO.102 How many workdays occur from the start of the Product Testing to the Product Available milestone?

 
 
 
 

NO.103 Constraints control events or activities that __________________.

 
 
 
 

NO.104 Project delays are best analyzed

 
 
 
 

NO.105 Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

 
 
 
 

NO.106 Total float is defined as the amount of time an activity can be delayed without impacting

 
 
 
 

NO.107 Which activity is drawn in the incorrect position?

 
 
 
 

NO.108 Using the “normal” schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?

 
 
 
 

NO.109 During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?

 
 
 
 

NO.110 Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?

 
 
 
 

NO.111 Determine the correct formula and date for the late start for the Activity 11001:

 
 
 
 

NO.112 Why does activity 11001 not show successor activities?

 
 
 
 

NO.113 Which of the following parties is NOT a stakeholder of the Spring Highway project?

 
 
 
 

NO.114 What is the remaining work duration of Active D?

 
 
 
 

NO.115 Time-scaled logic diagrams are

 
 
 
 

NO.116 Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing “no differing sit conditions” and “no damage for delay” clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
“normal” schedule and $3,200 for the “crashed” schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor’s operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the “normal” schedule, what is the cost of this hammock?

 
 
 
 

NO.117 What is the relationship depicted between Activity G and Activity H?

 
 
 
 

NO.118 What day would Activity C complete if the duration of Activity A was reduced by five days?

 
 
 
 

NO.119 There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

 
 
 
 

Exam Materials for You to Prepare & Pass AACE-PSP Exam: https://www.trainingquiz.com/AACE-PSP-practice-quiz.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Please sing in to post your comment or singup if you don't have account.
Enter the text from the image below